{"id":22663,"date":"2026-11-25T21:32:57","date_gmt":"2026-11-26T00:32:57","guid":{"rendered":"https:\/\/anacouto.com.br\/?p=22663"},"modified":"2026-11-25T21:33:30","modified_gmt":"2026-11-26T00:33:30","slug":"execucao-planejamento-estrategico-plano-90-dias","status":"publish","type":"post","link":"https:\/\/anacouto.com.br\/en\/artigos\/2026\/11\/25\/execucao-planejamento-estrategico-plano-90-dias\/","title":{"rendered":"From the annual plan to the next 90 days: how to take the 2027 strategy from paper to reality.\u00a0"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><em>An annual plan without a first cycle is merely an intention. The strategy begins to exist when each priority has an owner, resources, and a review date.<\/em>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Most plans don't fail in their formulation. They fail in the following weeks. The document is approved in December, operations pick up speed again in January, and by April, nobody remembers what the five priorities for the year were.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A <strong>execution of strategic planning<\/strong> It depends less on individual discipline and more on structure: clear horizons, defined responsibilities, follow-up rituals, and space to learn. In this article, we show how to organize this structure based on the best practices of the paper. <em>Strategic Planning 2027<\/em>, from the anaconda.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How to plan across different time horizons.<\/strong>&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">One of the most common pitfalls is trying to answer all questions within the same timeframe. Some decisions require a ten-year vision. Others need to be made in the coming weeks. Mixing these timeframes leads to plans that are either too rigid or too tactical.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The paper is inspired by the concept <em>Zoom Out \/ Zoom In<\/em>, Developed by Deloitte, it proposes layered planning:&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Horizon<\/strong>&nbsp;<\/td><td><strong>Main question<\/strong>&nbsp;<\/td><\/tr><tr><td>Vision (10 years)&nbsp;<\/td><td>What kind of future do we want to build?&nbsp;<\/td><\/tr><tr><td>Ambitions (3 years)&nbsp;<\/td><td>What do we need to achieve to get there?&nbsp;<\/td><\/tr><tr><td>Priorities (12 months)&nbsp;<\/td><td>What really needs to happen this year?&nbsp;<\/td><\/tr><tr><td>Execution (90 days)&nbsp;<\/td><td>What initiatives are starting now?&nbsp;<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The 90-day cycle is where strategy meets the calendar. It's short enough to generate urgency and long enough to produce observable results.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An example of a decision that transcends different horizons is the work we did for the <a href=\"https:\/\/anacouto.com.br\/cases\/light\/\" target=\"_blank\" rel=\"noopener\">Light<\/a>. With 121 years of history, the company sought to renew its concession contract for another 30 years, a very long-term horizon. To achieve this, the branding platform repositioned the brand as a structuring agent of development, and the strategy took concrete form: the \u201cEverything's Light\u201d campaign, with a film, jingle, radio spot, outdoor and digital media, and the redesign of the stores as an extension of the brand. A long-term vision only becomes credible when it appears in initiatives that people can see.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How to break down the annual priority<\/strong>&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Each 12-month priority needs to be broken down into four elements before the first cycle:&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Initiative.<\/strong> What, specifically, will be done in the next 90 days?&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Responsible.<\/strong> One person, not one department. Accountability, as defined in the paper, goes beyond simply assigning responsibilities: it's about creating an environment where each initiative has an owner, clear objectives, monitoring, and autonomy.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Indicator.<\/strong> This shows that the initiative is progressing. The OKR and SMART goals templates in the paper help to make this indicator specific, measurable, and time-bound.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>First round decision.<\/strong> What needs to be decided by the end of the 90 days for the priority to continue, change, or be stopped?&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><em>Hypothetical example:<\/em> The annual priority is to gain relevance in a new customer segment. In the first cycle, the initiative is to listen to this audience and test two messages on digital channels. The owner is the brand manager. The indicator is the difference in interest between the two messages. The decision at the end of 90 days is which one guides the communication for the second quarter. A vague priority has become a concrete choice with a set date.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How to create follow-up rituals<\/strong>&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Planning is only a living system if there are regular times to review it. The paper proposes changing four habits:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Instead of reviewing the plan once a year, create periodic rituals of <strong>strategy review<\/strong>.\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Instead of just monitoring performance indicators, also track changes in the market, behavior, and technology.\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Instead of waiting for the end of the cycle to adjust priorities, adapt initiatives when the context demands it.\u00a0<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Instead of treating the plan as a document, view it as a continuous decision-making system.\u00a0<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">One possible cadence, presented here as an editorial example and not as a rule, combines three encounters: one <strong>biweekly follow-up<\/strong> short distance between the owners of the initiatives, to remove blockages; a <strong>monthly review<\/strong> with leadership, to decide on adjustments; and a <strong>quarterly review<\/strong>, which closes the 90-day cycle and opens the next one.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The key point is focus. Rituals that become status displays are time-consuming and change nothing. The question for each meeting should be: what do we need to decide today?&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How to incorporate experiments and learnings<\/strong>&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In a constantly changing environment, a good plan doesn't try to predict all the answers. It creates room for testing. The paper suggests transforming big bets into testable hypotheses, prioritizing pilot projects before large investments, and measuring learning, not just results.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For this to work, each pilot program needs defined criteria before starting: what constitutes success, what justifies scaling up, and what justifies stopping. The quarterly review is the natural time for these decisions, and the lessons learned are incorporated into the plan for the next cycle.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How to anticipate necessary hiring.<\/strong>&nbsp;<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A silent cause of delay is late-starting contracting. The initiative is approved, the owner is defined, but the external partner, research firm, or tool has not yet been contracted when the cycle begins.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before the first cycle of 2027, map out for each initiative: which <strong>dependencies<\/strong> external ones she has, which ones <strong>internal approvals<\/strong> What are the necessary departments (legal, purchasing, management) and which ones? <strong>services<\/strong> They need to be hired so that it can start on time. In many companies, this process takes weeks. If the initiative starts in January, the conversation needs to begin now.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>90-day plan<\/strong>&nbsp;<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Use one line for each initiative in the first cycle.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Initiative<\/strong>&nbsp;<\/td><td><strong>Owner<\/strong>&nbsp;<\/td><td><strong>Resource<\/strong>&nbsp;<\/td><td><strong>Indicator<\/strong>&nbsp;<\/td><td><strong>Review date<\/strong>&nbsp;<\/td><\/tr><tr><td>&nbsp;<\/td><td>&nbsp;<\/td><td>&nbsp;<\/td><td>&nbsp;<\/td><td>&nbsp;<\/td><\/tr><tr><td>&nbsp;<\/td><td>&nbsp;<\/td><td>&nbsp;<\/td><td>&nbsp;<\/td><td>&nbsp;<\/td><\/tr><tr><td>&nbsp;<\/td><td>&nbsp;<\/td><td>&nbsp;<\/td><td>&nbsp;<\/td><td>&nbsp;<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Vision guides. Priorities choose. The 90 days prove it.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/anacouto.com.br\/planejamento-estrategico-2027\/\" target=\"_blank\" rel=\"noopener\"><strong>Download the Strategic Planning 2027 paper.<\/strong><\/a> <strong>and learn the principles for transforming direction into execution.<\/strong>&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To get your company's priorities moving in 2027, <a href=\"https:\/\/anacouto.com.br\/contatos\/\" target=\"_blank\" rel=\"noopener\"><strong>talk to the anaconda<\/strong><\/a>.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Um plano anual sem primeiro ciclo \u00e9 uma inten\u00e7\u00e3o. A estrat\u00e9gia come\u00e7a a existir quando cada prioridade tem dono, recurso e data de revis\u00e3o.&nbsp; A maioria dos planejamentos n\u00e3o falha na formula\u00e7\u00e3o. Falha nas semanas seguintes. O documento \u00e9 aprovado em dezembro, a opera\u00e7\u00e3o retoma o ritmo em janeiro e, em abril, ningu\u00e9m lembra quais [&hellip;]<\/p>\n","protected":false},"author":21,"featured_media":22664,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[336,339,337],"class_list":["post-22663","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-execucao-do-planejamento-estrategico","tag-gestao-estrategica","tag-plano-de-acao-90-dias"],"_links":{"self":[{"href":"https:\/\/anacouto.com.br\/en\/wp-json\/wp\/v2\/posts\/22663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/anacouto.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/anacouto.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/anacouto.com.br\/en\/wp-json\/wp\/v2\/users\/21"}],"replies":[{"embeddable":true,"href":"https:\/\/anacouto.com.br\/en\/wp-json\/wp\/v2\/comments?post=22663"}],"version-history":[{"count":1,"href":"https:\/\/anacouto.com.br\/en\/wp-json\/wp\/v2\/posts\/22663\/revisions"}],"predecessor-version":[{"id":22666,"href":"https:\/\/anacouto.com.br\/en\/wp-json\/wp\/v2\/posts\/22663\/revisions\/22666"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/anacouto.com.br\/en\/wp-json\/wp\/v2\/media\/22664"}],"wp:attachment":[{"href":"https:\/\/anacouto.com.br\/en\/wp-json\/wp\/v2\/media?parent=22663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/anacouto.com.br\/en\/wp-json\/wp\/v2\/categories?post=22663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/anacouto.com.br\/en\/wp-json\/wp\/v2\/tags?post=22663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}